Winkler AG moves to new location in St. Leon-Rot after 45 years

After 45 years at its previous location, Winkler AG is setting the course for the future: at the turn of the year 2026, the company will move to a new, modern location in St. Leon-Rot. This will bring logistics, production and administration together at one location for the first time – an important step towards further professionalization and sustainable development of the company.
With the new location, Winkler AG is creating optimal conditions for efficient processes and shorter distances between the divisions. In future, logistics and production will be directly connected to the office and administration areas. The spatial proximity will enable a much better integration of processes and strengthen cooperation between the teams in day-to-day business.
The move takes place in two steps
- from 01.01.2026: Move into the production and logistics hall
- from 02.02.2026: Relocation and occupation of the entire office space
This ensures that operations can continue reliably during the transition phase.
With the move, the following addresses will apply from 2026
Logistics / Production
Winkler AG
Opelstraße 3
68789 St. Leon-Rot
Office / Administration
Winkler AG
Opelstraße 1
68789 St. Leon-Rot
The new location is more than just a change of location – it is a clear commitment to the future viability of Winkler AG. Modern space, optimized working conditions and an efficient infrastructure create the basis for further growth and greater operational efficiency.